Posted 10:29 a.m. Thursday, Sept. 10, 2009
Stadium Fast Facts | |
Budget: $16,508,921.00 Seating Capacity: 6,513 in stands ADA Seating: 58 wheelchair accessible Size of the Site: 20.02 Acres Elevation at Press Box Level: 739.5 FT Elevation at Field Level: 675.5 FT Construction Time: Started June 9, 2008; Track & Fields completed by June 5, 2009; Project completed by Sept. 1, 2009 Architect: HSR Associates, La Crosse, WI Football Playing Surface (Type and Amount of Space): Field Turf Synthetic Surface, 76,438 SF Ticket Windows: 8 | Track Surface (Type and Amount of Space): Beynon Elastomeric Polyurethane with Embedded Granules, 92,044 Total SF, Track only 55,832 SF Soccer Surface (Type and Amount of Space): Natural Grass, 93,100 SF Size of Locker Rooms: Home Team Meeting Room: 1,681 SF; Visitor Team Meeting Room: 671 SF Size of Athletic Training Room: 658 SF Veterans Hall of Honor: 1,151 SF Dedicated Space, with Special Finish Package Number of Women’s Restrooms: 44 Stalls Number of Men’s Restrooms: 10 Stalls, 11 Urinals Concession Points of Sale: 4 Windows, 910 SF of Concession Space |
Number of Track Venues (Jumps, Throws): 10 Lane Running Track 2 Shot Put Areas Javelin Run 2 Pole Vault Lanes 4 Long Jump/Triple Jump Pits Discuss Cage Hammer Throw Cage |